Medium
Voltage Circuit Breaker Rated 5KV, 7.2KV or 15KV.
All breakers are completely rebuilt and tested in accordance
with the following procedure:
Complete disassembly of breaker.
Inspection of each part for physical integrity
per manufacturer's specifications.
Worn parts replaced.
Close inspection of the operation of the breaker's
main arcing contacts to insure that all springs responsible
for maintaining primary contact pressure are in good
condition.
Base painted.
All parts repainted, replaced and/or reinsulated
as required.
Arc chutes inspected.
All wiring inspected and replaced if needed (based
on original wiring diagram).
Fully lubricate breaker.
Breaker reassembled according to manufacturer's
specifications.
ELECTRICAL TEST TO
INCLUDE
Measure contact resistance.
Perform minimum pickup voltage tests on trip and
close coils.
Perform insulation resistance tests; pole to pole,
pole to ground and across open pole.
If charging motors are used, check condition of
brushes and limit switches.
Perform over-potential test, or power factor test
with breaker in open and closed position. Includes
(optional) testing of all arc chutes for watts loss.
All rebuilt breakers will be returned in equal
to new condition with a two (2) year guarantee.
REBUILD
PROCEDURE
Low Voltage Air Circuit
Breakers Rated 240 VAC, 480VAC or 600VAC
All
breakers are completely rebuilt and tested in accordance
with the following procedure:
Complete disassembly of breaker.
Inspection of each part for physical integrity per
manufacturer's specifications.
Worn parts replaced.
Close inspection of the operation of the breaker's
main arcing contacts to insure that all springs responsible
for maintaining primary contact pressure are in good
condition.
Base painted.
All parts repainted, replaced and/or reinsulated
as required.
Trip units removed and inspected, dashpots cleaned
and refilled with proper oil.
Complete wiring inspection of all electrically
operated breakers.
Fully lubricate breaker.
Breaker reassembled per manufacturer's specifications.
ELECTRICAL TEST TO INCLUDE
Measure contact resistance.
Perform minimum pickup voltage tests on trip and
closed coils.
Long time delay shall be determined by primary
injection at 300% pickup current.
Short time delay determined by primary injection.
Instantaneous pickup current determined by primary
injection. All primary injection tests will adhere
to the manufacturer's original specifications.
Trip unit reset will be verified.
Charging motors of electrically operated breakers
to be opened and inspected for brush damage.
All rebuilt breakers will be returned in equal
to new condition with a two (2) year guarantee.